ProjectAt a certain company, successful projects proceed through 8 stages-Stages A through H. An active project is one that is currently in one of these 8 stages. If a stage of a project is completed during a given day, the project is immediately moved to the next stage. At the end of each day, the current stage of each active project is recorded. Some stages require as little as 1 day of work, and none requires more than 3 days of work. A project is said to be delayed if it spends more time at a stage than is required to complete the work. If a project is canceled, the current stage for the day is recorded as Stage X, and the project is no longer considered an active project.Stages and ClustersFor any given project, the diagram shows the progression of the stages of the project as well as the department of the individuals responsible for each stage. The stages-divided into the initial, intermediate, and final clusters-are each assumed to constitute some nominal fixed percentage (NFP) of the project's lifetime. In the diagram, each cluster percentage is the sum of the NFPs for the stages within the cluster.

A status history report-a report containing the daily project status for any project that was active within a given timeframe-is produced by a computer program. Below is the report that was generated at the end of the day today, which is the fifth day of Week 7. The report shows, for example, that Project 75039 began on the second day of Week 6, spent 3 days each in Stages A and B, and has been in its current stage, Stage C, for 3 days.

For each of the following projects, select Delayed if it can be inferred from the information in the tabs that the project must have experienced a delay at one or more stages. Otherwise, select Not necessarily delayed.
視頻解析
暫無視頻解析,點擊獲取更多視頻內(nèi)容
文字解析
GMAT會員
- 【OG18-P680-668題】In a review of 2,000 studies of human behavior that date back to the 1940s, two Swiss psychologists, declaring that since most of the studies had failed to control for such variables as social class and family size, none could be taken seriously.
- 【OG18-P680-671題】Manufacturers rate batteries in watt-hours; if they rate the watt-hour higher, the longer the battery can be expected to last.
- 【OG18-P680-672題】At the end of the 1930s, Duke Ellington was looking for a composer to assist him-someone not only who could arrange music for his successful big band, but mirroring his eccentric writing style as well in order to finish the many pieces he had started but never completed.
- 【OG20-P569-634題】Snowmaking machines work by spraying a mist that freezes immediately on contact with cold air. Because the sudden freezing kills bacteria, QuickFreeze is planning to market a wastewater purification system that works on the same principle. The process works only when temperatures are cold, however, so municipalities using it will still need to maintain a conventional system. Which of the following, if true, provides the strongest grounds for a prediction that municipalities will buy QuickFreeze's purification system despite the need to maintain a conventional purification system as well?
- 【OG20-P147-8題】(12 -13 )+(13 -14 )+(14 -15 )+(15 -16 )=

添加官方小助手微信
了解更多GMAT考試與咨詢

400-1816-180








12G備考資料